A large oil tank is built at the project site. The construction steps from the foundation and bottom plates to erecting the shell, a fixed or floating roof, and the hydrotest with settlement monitoring.
The hydrotest is a tank's final exam before delivery, and we carry it out in our own factory. The test pressure, the work before filling, and the mistake that can ruin a tank while it is being drained.