Building a pressure vessel differs from an ordinary storage tank: material traceability, head thickness checks after forming, nozzle reinforcement, PWHT and a hydrotest at 1.3 times.
The hydrotest is a tank's final exam before delivery, and we carry it out in our own factory. The test pressure, the work before filling, and the mistake that can ruin a tank while it is being drained.