The least thickness needed of all head types

Hemispherical head (Hemispherical)

Mechanically the most efficient shape, but the most expensive to make

A hemispherical head is exactly half of a sphere: its radius (CR) is half the vessel's inside diameter (0.5×Di) and its depth (DH) is exactly the same radius. This head has no separate knuckle because its whole surface is one uniform curvature, just like the body of a spherical vessel.

Hemispherical

Hemispherical

  • Di = Do − 2t
  • CR = 0.5 × Di
  • DH = CR
  • THi = SF + DH
  • DH 700 mm
  • THi 742 mm
  • CR 700 mm
  • SF 42 mm
CR formula
CR = 0.5 × Di
Depth formula (DH)
DH = CR (equal to the vessel radius)
Knuckle radius (KR)
None; continuous curvature
SF formula
Greater of 3.5×t or 0.03×Di
The least thickness needed of all heads
Completely uniform stress distribution
Head depth exactly equal to the vessel radius
No separate knuckle; one continuous curvature
Suited to very high design pressure
Made in carbon steel and stainless

What is a hemispherical head?

A hemispherical head is exactly half of a sphere: its radius (CR) is half the inside diameter of the vessel and its depth is exactly the same radius. This head has no separate knuckle, because its whole surface is one uniform curvature.

This uniformity means the stress from internal pressure is spread evenly, so for a given pressure it needs the least thickness of all head types; in return, forming it is more expensive than for shallower forms.

Geometry formulas of the hemispherical head

The hemispherical geometry has the simplest and at the same time the strongest relation:

Crown radius
CR = 0.5 × Di
Head depth
DH = CR
Knuckle radius
None — continuous curvature
Straight flange
SF ≥ max(3.5 t, 0.03 Di)
Workshop note

If the design pressure is so high that an elliptical or torispherical thickness becomes impractical, the cost of forming a hemisphere is justified by the plate saving.

Online calculation

See the head's dimensions, volume and weight for a real diameter and thickness

Hemispherical head (Hemispherical)

Hemispherical

Hemispherical

  • Di = Do − 2t
  • CR = 0.5 × Di
  • DH = CR
  • THi = SF + DH
  • DH 700 mm
  • THi 742 mm
  • CR 700 mm
  • SF 42 mm

Liquid level and volume inside this head

How the head is mounted
Internal surface area of the head0m²
Plate weight of this head0kg
Liquid weight at this level0kg
Full capacity of this head0m³
Liquid volume in this head0m³
Total weight (fluid + head)0kg

Development of this head (flat blank before forming)

The diameter of a flat plate of the same thickness and material that weighs the same as the formed head — an initial workshop estimate based on equal weight, not allowing for thickening or extra stretching at the knuckle.

Flat blank radius (development)0mm
Flat blank diameter (development)0mm
Flat blank area0m²

The vessel head production process

From calculating the blank diameter to final edge preparation — the steps of making a vessel head in the workshop

  1. Calculating the blank diameter

    Cutting a disc from plate with the diameter and thickness calculated for the head type and vessel diameter

  2. Cutting the plate blank

    Precise cutting of steel or stainless plate by plasma, laser or gas according to the technical drawing

  3. Pressing the head

    Hot or cold forming of the disc with a die and industrial press until it reaches the final head profile

  4. Edge preparation

    Machining the edge, bevelling and preparing the weld area for fitting to the vessel shell

Pressing a vessel head in the Behineh Ab workshopVideo coming soon

Choosing a head: the balance between pressure, cost and time

If the design pressure is so high that the thickness needed for elliptical or torispherical heads becomes impractical (very thick plate, high weight and transport cost), the extra forming cost of a hemisphere is economically justified by the plate saving.

1Take the design pressure and temperature from the data sheet
2Check the height limit at the installation site
3Compare the cost of plate with the cost of pressing
4Consider die availability and delivery time
Pressed heads in the workshop store

Applications and industries served

Very high pressure vessels
Very high pressure vessels
Spherical and semi-spherical gas storage vessels
Spherical and semi-spherical gas storage vessels
Chemical reactors with critical pressure
Chemical reactors with critical pressure
Aerospace and defence vessels
Aerospace and defence vessels

Buying heads from Behineh Ab

Six steps from first contact to delivery

1Send the head specifications

Give the outside diameter, plate thickness, head type and required material.

2Technical quotation

The calculated weight, unit price and delivery time are sent the same business day.

3Plate supply

Plate is supplied with the mill certificate and inspected on arrival before cutting.

4Cutting and pressing

Cutting the disc, hot or cold pressing depending on thickness, and checking dimensions with a template.

5Edge machining and bevelling

Machining the cylindrical edge and bevelling it ready for welding to the shell.

6Packing and shipping

Packing, issuing the part identification sheet and shipping nationwide.

What sets us apart

Ready dies for the most common diameters
Thickness checked after pressing with a thickness gauge
Profile checked against a reference template for each form
Plate material certificate with every shipment
Hot pressing for thicknesses above 16 mm
Stainless and galvanized heads available

Price inquiry
vessel head

Enter the diameter, thickness and head type; you will receive the calculated weight and unit price.

  • Quotation with the exact weight of the part
  • Standard heads delivered in 7 business days
  • Shipping nationwide
Direct line to engineering office
021 - 3345 6789

Your information is confidential and used only to prepare a technical proposal.

Other head types

All articles
  • Assembling the shell and head of a steel tank in the Behineh Ab tank fabrication workshop

    Steel Tank Manufacturing Steps, from Order to Delivery

    The steps of building a steel tank, from the data sheet to testing and dispatch. A 20,000-litre tank takes about three weeks; here is what that time is spent on.

    Read more
  • Inspector carrying out a non-destructive test on a steel tank shell weld

    Tank Tests: What Defect Does Each Test Find?

    Hydrotest, radiography, ultrasonic, liquid penetrant, magnetic particle and vacuum box. Each finds a particular defect and none can replace another. Here we compare them.

    Read more
  • Pressure vessel under hydrostatic test with a pressure gauge in the Behineh Ab workshop

    Tank Hydrostatic Test, Step by Step

    The hydrotest is a tank's final exam before delivery, and we carry it out in our own factory. The test pressure, the work before filling, and the mistake that can ruin a tank while it is being drained.

    Read more
  • Radiography film of a tank shell weld on a film viewer

    Weld Radiography: What Percentage of Seams Must Be Tested?

    The radiography percentage sets the joint efficiency, and the joint efficiency sets the plate thickness. In other words, this decision directly affects the tank's weight and price.

    Read more