Design & calculations

Manway layout and access openings on tanks

How diameter, elevation, and clearance from nozzles keep maintenance safe.

Flanged manway on a pressure vessel shell
Read time4 min
PublishedApr 1, 2026
AuthorTank design unit
CategoryDesign & calculations

How diameter, elevation, and clearance from nozzles keep maintenance safe.

Access without fighting equipment

A manway must allow person entry, inspection gear, and emergency exit without clashing with nozzles, supports, or insulation. Inside diameter and opening reinforcement are part of the shell calculation.

Common manway sizes

Inside diameterTypical use
500 mm (20 in)Common minimum for entry with basic gear
600 mm (24 in)More common standard, easier entry with inspection equipment
Over 600 mmLarge tanks or where internals must be removed

For heavy manway covers, a davit arm or a hinge lets one person open and close it without a crane or extra hands — cutting the risk of injury during maintenance.

Tags:manwaylayout

Related articles

Have a project in the works?

Send a datasheet, or just describe the working conditions — you'll get initial calculations and a technical proposal back.

Request technical advice